Motorola
JLRD's engineering modifications
of the Boynton Beach and Plantation manufacturing plants include
HVAC equipment replacement, anechoic chambers, chilled water secondary
pumping and product loading dock.
|
|
|
Hoke
Library
JLRD provided Mechanical and Electrical engineering design for this
municipal library in Martin County, Florida
|
|
|
Tri-GAS
As the electrical engineer
of record for this air separation plant, JLRD integrated various
building systems, 15kv power distribution and industrial lighting
for this plant expansion.
|
|
|
Palm
Beach County Resource Recovery
This 30,000 s.f. warehouse,
visitor center, and vehicle fueling area and expansion of the plant's
infrastructure design elements were closely coordinated with the
plant operations staff.
|
|
|
NASA
- RLV Hangar
This 3 building complex
is used to support the next generation reusable launch vehicle.
This 100,000 sf hanger utilizes a full coverage deluge fire protection
system.
|
|
|
NASA
- Industrial Area Chiller Plant
JLRD preformed design
for this building expansion, in addition to the 7,500 tons of chilled
water capacity that was added to the existing industrial area chiller
plant utilizing primary, secondary, and tertiary pumping schemes.
|
|
|
Palm
Beach County Water Utilities Department - Customer Service
This facility serves dual
functions as a customer service and central dispatch 24-hour data
center for all of Palm Beach County.
|
|
|
Miami
GSA Energy Audit
JLRD performed an energy
analysis as a consultant to FPL for over one million square feet
of governmental office space in Miami.
|
|
|
Palm
Beach County Branch Library Prototype
Core considerations of
the branch county library prototype designs are acoustics of HVAC
system and efficient vertical lighting of book racks.
|
|
|
Palm
Beach International Airport
Directional Wayfinding
Enplaning
Curb-side Baggage Check
US Airways Club
|
|
|
NASA OSB II Telecom
JLRD was selected as the
telecommunications consultant for the design of structured cabling
for telephone and computer networks in this new 200,000 s.f. facility
at Launch Complex 39, Kennedy Space Center.
|
|
|
NASA
Vehicle Assembly Building
Moderization and consolidation
of the medium and low voltage power distribution effected the replacement
of 100+ panels and 12 substations with remote monitoring and control.
|
|
|
NASA
Launch Control Center
JLRD designed the complete
replacement of all lighting, and installation of a new fire protection
system throughout this building at Kennedy Space Center.
|
|
|
NASA
Orbiter Processing Facility (OPF)
JLRD is currently designing
the replacement of power unit substations to serve this facility
that prepares the shuttle for upcoming missions.
|
|